Skip to main content

Intelligence workbench

Historical account-planning preview

Back to snapshot

Project record · 10182203

StrucLock: Circular Structural Wall System Validation Through Independent LCA and Demonstrator Performance Testing

Recipient: STRUCLOCK LIMITED

Verified official record

SOURCE FACTS

Imported fields from the dated official snapshot. The displayed source does not establish a procurement plan or unrestricted spending.

Recipient organisation
STRUCLOCK LIMITED
Project reference
10182203
Funder
Innovate UK
Programme
National Materials Innovation Programme: Feasibility Studies
Award value
£27,362
Project dates
1 May 2026 – 31 Jan 2027
Imported sector
Advanced Manufacturing Lvl3
Postcode area
L (L33 4YA)
Project status
Live
Source data quality
Description present in snapshot

Derived analysis

GRANTSIGNAL INFERENCES

Commercial inference — not stated procurement intention.

Possible supplier-fit category: PROTOTYPING

Evidence from description:demonstrator

The project description mentions this activity; it does not state an intent to buy from a supplier.

low confidence

This is a categorisation of wording in the project description, not a claim that the recipient intends to buy, tender, appoint, or contact any supplier.

Official project description

StrucLock is developing a modular construction system that transforms recycled plastic and textile waste into high-performance building blocks. Designed for disassembly, reuse and low-impact construction, the blocks combine structural strength with built-in insulation and service channels, removing the need for separate framing, plasterboard or insulation materials. This reduces construction waste, simplifies assembly, and allows buildings to be dismantled and relocated rather than demolished. To support future industrial adoption, StrucLock is carrying out a feasibility study that includes: • a demonstrator fitted with sensors to record real-time thermal performance • an independent life-cycle assessment evaluating environmental and resource factors The project will generate evidence on material efficiency, environmental impact and practical build processes, helping organisations seeking lower-carbon, circular alternatives to traditional construction materials.

Provenance & data availability

Snapshot imported
10 Aug 2026, 07:53 UTC
Source publication/snapshot date
2026-07-06
Source
Innovate UK funded-project workbook via UKRI
Company matching
Not assessed in this demo. A supplied company number may exist in the source, but it has not been independently verified against Companies House.

The validation found that the snapshot first-seen time followed project starts in the reviewed sample. This demo is therefore historical research only, not a new-award, current-status, or project-timing service.

    Your privacy choices

    Necessary storage keeps account sign-in and security working. Optional analytics is off unless you actively allow it. Read the cookie notice.